Exhibition stand construction · Moscow

From an empty hall
to the first guest

Stage 02

A frame in one night

Our own steel structure and trusses, assembled to a drawn plan with no improvising on site.

Stage 03

A finish that reads as an interior

Veneer, stone, painted panels. Everything is made in our workshop and arrives as ready modules.

Stage 04

Light decides everything

Hidden LED lines, accent track lights, greenery. The stand is seen from across the hall.

Stage 05

Handed over before opening

Cleaning, furniture, decor, a final check. You arrive at a finished stand.

Stage 06 · Opening

The doors are open.
Guests are already here.

  1. Site
  2. Frame
  3. Finish
  4. Light
  5. Handover
  6. Opening
340+stands built
72 haverage build time
12years at exhibitions
4,800 m²of our own workshop

What we do

The whole stand from one contractor

01

Concept and 3D

Architectural design, renders and working drawings to the organiser's rules.

02

Production

Our own workshop: metal, joinery, paint, print. We check every element.

03

Build and dismantling

Crews in Moscow and the regions, logistics, venue approvals.

04

Light, media, decor

LED screens, lighting scenes, live plants, furniture and catering areas.

How we work

Four steps to opening day

  1. 01

    Brief

    Your goals, budget, area and place in the hall.

  2. 02

    Design

    Concept, 3D and estimate in 5 working days.

  3. 03

    Production

    Modules are made and pre-assembled in the workshop.

  4. 04

    Build

    Assembly on site and handover before the doors open.

Is your next exhibition already in the calendar?

Send us the hall plan. We will show the first concept within a week.

Discuss a project