Exhibition stand building

Installation and dismantling

Stand assembly by our own crews, including overnight before opening.

Get a quote

Overview

Installation is the final and most intense stage: within the organizer's time slot, the structure has to go up, the lighting has to be connected and the graphics and furniture have to be in place. Our crews work from drawings and a prepared plan, including night shifts when needed. After the show closes, we take everything apart, pack it and haul it away.

We arrange passes for the crew, organize delivery and coordinate with the venue's technical team. Before opening we check every joint and hand the stand over with a signed acceptance form. A tip: book your load-in time and power hookup as soon as your participation is confirmed. Slots on the first build-up days fill quickly.

What you get

  • In-house installation crews
  • Overnight shifts before opening
  • Crew passes and venue coordination handled
  • Lighting and electrical hookup
  • Dismantling, packing and removal

Where it is used

  • Shows in Moscow
  • Regional exhibitions
  • Stands designed elsewhere

How we work

Four steps to opening day

  1. 01

    Brief

    Your goals, budget, area and place in the hall.

  2. 02

    Design

    Concept, 3D and estimate in 5 working days.

  3. 03

    Production

    Modules are made and pre-assembled in the workshop.

  4. 04

    Build

    Assembly on site and handover before the doors open.

More in this section

Need a quote?

Describe the task and we will send an estimate and timing within one working day.

Get a quote

Phone +7 903 163-65-23

ANTA SYSTEMS

Let's discuss your project

Tell us about the exhibition and the stand — we reply within one working day.

Call us+7 903 163-65-23

or leave a request

JPG, PNG or PDF up to 10 MB: hall plan, references, brief